Developed concept for most of the buildings, elevations and renderings, multiple revisions, site levels coordination with external consultants.
The project was structured in two main phases. The first involved the development of concept designs for around fifty buildings of various types for the new military base, which is currently under construction, as well as for the Headquarter area located in a more central district of Riyadh. The second phase focused on the detailed and final design development of the same buildings, along with the coordination of the different disciplines involved. The effort required was substantial, given the scale and complexity of the project and the wide range of building typologies addressed.
50+ buildings
several buildings concept layout
+200 3d models and renderings
concept design
site levelling coordination
development of a facade strategy